一、What is a glass tube?
Glass steel pipe is not steel pipe, do not use welding, mainly using O-ring connection. With “O” type sealing ring docking, the material of glass steel pipe is resin, pay attention to the smooth groove surface and working surface, whether there are cracks, bubbles and so on.
二、What should I do before construction?
- Before the construction, we should be familiar with the drawings, listen to the technical disclosure of the designers, understand the content and quality requirements of the project purpose, and put forward the problems existing in the design and reasonable revision opinions in time.
- The installation of glass-tube engineering has always been an important part of water supply and drainage engineering in terms of investment, construction period, or safe water supply, which ensures the quality of pipeline construction and provides a reliable guarantee for the implementation of the whole project. In order to do a good job in the construction, we should do a good job in the preparation before the construction.

- The material composition of glass pipe is different from that of steel pipe, cast iron pipe, or reinforced concrete pipe with wire wound. It is a kind of composite flexible pipe material, the port of the pipe must meet the requirements of the engineer.
- Before construction, the stiffness of the pipeline should be checked according to the dynamic load of the undisturbed soil and other parameters. The construction method and backfill form should be arranged according to the stiffness selected by the design, so as to ensure the quality of the construction period, reduce the construction period and reduce the total investment of the project
- The interface between FRP sand pipe and pipe adopts socket type double O type sealing ring connection, and its assembly method is similar to socket type cast iron pipe installation.
三、What should I pay attention to when installing FRP pipes?
Before installation, read the instruction manual and observe the following items during installation:
- Check and accept the specifications, sizes and pressure grades of all pipes, which should be consistent with the design drawings;
- The pipe should be stored in a relatively flat place;
- Prepare the assembly machine and tools. Different equipment is used for different specifications.
- Compile the construction plan according to the construction drawing. The preparation of the construction plan is similar to the installation of other types of pipe materials;
- Configuration of all pipeline accessories, such as elbow, exhaust valve tee, drainage valve and the matching valve;
- Before assembling the pipes, the basic dimensions of the earthwork shall be inspected to confirm that they conform to the design requirements.

Inquiry please contact.
Email ✉: cn@chinaestop.cn
Whatsapp✆:+86 15350598856
Web: www.chinaestop.cn
——————————————————————————
“ Wish to be your best partner in China! Welcome to visit our company ”